It's tempting to open a new drawing set and start counting straight away. The deadline is close and counting feels like progress. But the most expensive construction takeoff mistakes usually aren't miscounts. They come from not understanding the set before you start: a missing sheet, a note that moves scope onto your trade, a typical floor that isn't quite typical.
A first read takes twenty to forty minutes on most small and medium jobs. Here's what to look at, in order.
1. The sheet index
Find the drawing index, usually on the cover sheet or the first general sheet, and check it against what you actually received. Note:
- Sheets listed but not included.
- Sheets included but not listed.
- Sheets from other disciplines that might affect you, such as reflected ceiling plans or structural sections.
Write the gaps down. You'll either request them or carry an assumption in your quote.
2. Issue status
Look at the title blocks. What is the set issued for: tender, information, construction? Are all sheets at the same issue, or are some older? A mixed set is common, and it's worth knowing before you count.
3. General notes
General notes are where scope hides. Read them properly, not just the ones under your trade's heading. Look for:
- Responsibilities assigned to the contractor or subcontractor that may land on you.
- References to standards or specifications that drive what you must supply.
- Phrases like 'including all associated' or 'as required', which widen scope without showing anything on the plans.
4. Scope boundaries and interfaces
Work out where your work starts and stops. Who provides supports, openings and final connections? Where does your scope meet another trade's? Boundary questions are cheaper to ask now than to argue about later.
5. Specification references
If the drawings refer to a specification you don't have, that's a gap. If you do have it, skim the sections relevant to your trade for anything affecting quantity or type, such as required spares or testing.
6. Repetition
Many buildings repeat: typical floors, typical units, typical rooms. Repetition is good news for your takeoff, but check that typical really is typical. Compare two or three of the repeated plans side by side. Look for the odd unit near the stair or the floor with the plant room.
7. Plan your counting order
With all that understood, decide how you'll work through the set. A sensible order might be the largest or most complex areas first, then typical areas, then one-offs. A plan makes it easier to pause and resume, and to split the work if someone else is helping.
Bring the first read into the takeoff
Notes from a first read are only useful if you can find them while you count. Writing them on a separate pad means flicking back and forth.
ContractorCounter covers drawing markup alongside construction takeoff and estimating, all in one browser workspace. During the first read you can mark up the sheets directly: circle the note that shifts scope, flag the missing detail, label the floor that isn't really typical. When you move on to reviewing the AI-generated counts, those markups are on the drawing in front of you rather than in a notebook.
A short first-read checklist
- Sheet index checked against received sheets
- Issue status noted
- General notes read in full
- Scope boundaries listed
- Spec references checked
- Repeated areas compared
- Counting order planned
Seven lines, roughly half an hour, and a much lower chance of finding the important note after the quote has gone.