Pool removal in Los Angeles moves through 6 site stages, from draining to drainage holes at least 12 inches across, and Pool Removal Directory CA lays out the 2026 rules for each one here.
The Los Angeles Department of Building and Safety (LADBS) governs pool backfills inside City of Los Angeles limits through Bulletin P/BC 2026-111. The bulletin took effect on January 1, 2026 and was revised on June 2, 2026. Each neighboring office publishes its own handout, and those handouts describe the physical work in more detail than the city bulletin does. This guide follows the job in the order crews do it and notes where each office adds a rule.
Which Office Sets the Rules for the Work?
LADBS sets the rules for City of Los Angeles parcels under Bulletin P/BC 2026-111, and ZIMAS confirms whether a parcel sits inside city limits.
A Los Angeles mailing address does not settle the question. For unincorporated areas, Los Angeles County Public Works issues permits, according to the County permit portal. The County also runs 10 District Offices for unincorporated communities and 9 City Offices for incorporated cities. Burbank, Pasadena, Santa Monica, Glendale and Long Beach run their own building departments.
The two LADBS routes
LADBS Bulletin P/BC 2026-111 offers two routes. Part II removes the shell and compacts fill to at least 90 percent relative compaction under ASTM D1557. Part III leaves the shell in place under uncertified fill and limits the area to landscaping. Both routes need a grading permit, and the route decides most of the site work below.
Which route fits the yard
The future use of the ground decides the route. An ADU, a room addition, a garage or a rebuilt house over the old pool area needs Part II. A lawn, planting beds or open space can sit over Part III fill, as long as the pool sits on ground no steeper than 10 percent. A steep lot therefore follows Part II whatever the plan. The HCD ADU fact sheet, dated April 2026, states that a locality may not require rear or side setbacks over 4 feet for a new construction ADU.
Partial jobs
Some permits cover only part of a pool. A Westwood permit issued in May 2026 backfills a portion of an existing pool with certified fill. A June 2026 Hollywood permit keeps the shell under a partial fill while the rest of the pool is enlarged. An Encino permit issued in June 2026 lists 51 cubic yards for a partial backfill tied to a pool remodel. On a partial job, the same hole, fill and inspection rules apply to the part being filled.
Permit paperwork by office
LADBS Bulletin P/BC 2026-111 replaced P/BC 2023-111 and cites LABC Sections 106.1.2 and 7011.3. EPIC-LA is the County's online system for permits and inspections. AM J103 charges no plan check fee on the County grading permit. AM J103 also pairs the grading permit with a demolition permit for tax assessment purposes. Calabasas requires a grading permit when the full shell is removed and fill exceeds 25 yards. Rancho Palos Verdes starts with a Planning Minor Grading Permit application. Rancho Palos Verdes Building then asks for 2 site plans stamped by Planning and Public Works. Pasadena takes permit applications and fees at its Permit Center at 175 North Garfield Avenue.
Handouts compared in this guide
The comparisons below draw on 7 published sources. LADBS covers City of Los Angeles parcels, and AM J103 covers unincorporated County parcels. Five cities, Torrance, Calabasas, Rancho Palos Verdes, Palos Verdes Estates and Agoura Hills, each publish a separate handout. Each rule applies only inside the office that wrote it.
What Happens Before the Shell Is Broken?
Draining, utility marking and utility caps come first, and Angi lists professional draining at up to $200.
Draining the pool
Angi's Los Angeles pool removal cost page lists draining by a pro at up to $200, or a pump rental at $45 to $80. On its demolition handout, Agoura Hills sets water rules. Dechlorinated water may stay on site by percolation or go to the storm drain. Cleaning wastewater and filter backwash are not allowed, and contaminated or chlorinated water goes to an approved facility.
Marking and capping utilities
DigAlert marking through 811 comes before any excavation. The gas and electric lines to the pool equipment pad are capped before demolition. Agoura Hills caps gas at the meter and at the equipment, and removes the electrical sub-panel and sub-feed back to the service. In Rancho Palos Verdes, plumbing and electrical must be disconnected, and the inspector checks those disconnects. For Palos Verdes Estates, utilities are cut and capped, with dump receipts for the utility materials.
Timing the start
Work starts after the permit issues, and the gap between approval and issue varies. Across 7 reviewed 2026 LADBS grading permits that show both dates, the gap ran from the same day to 59 days. The longest was in Bel Air, at 59 days, and an August Brentwood permit issued on the day it was approved. In the middle, Westwood took 32 days, Hollywood 25 days, Chatsworth 18 days and Encino 4 days.
Checking the license
The Contractors State License Board lookup confirms whether a license is active and which classifications it holds. Agoura Hills accepts pool demolition applications from a homeowner or from contractors holding a B, C-53 or C-21 license.
How Much of the Pool Wall Comes Off?
Five of the 7 handouts remove the top of the wall to a set depth, from 18 inches to 3 feet below grade.
Depths by office
- Torrance removes the bond beam, gunite and other improvements to at least 18 inches on its shell-in-place route.
- Calabasas removes the coping at least 18 inches below finished grade.
- Agoura Hills removes the coping, bond beam and perimeter rebar at least 18 inches below grade.
- Palos Verdes Estates removes 24 inches of bond beam, with the inspector present at that stage.
- Rancho Palos Verdes removes the upper 2 to 3 feet of the pool wall and hauls it off site.
Why the top comes off
The bond beam is the concrete band at the top of the pool wall. On LADBS Part II, the entire shell leaves the site instead.
How Big Are the Drainage Holes?
LADBS requires holes at least 12 inches across, no more than 8 feet apart, with 1 at the deepest point.
The holes keep water from collecting in the buried basin. Every office below requires holes on its shell-in-place route, and the sizes differ widely.
<dl> <dt>LADBS</dt><dd>At least 12 inches across, no more than 8 feet apart, 1 at the deepest point.</dd> <dt>AM J103</dt><dd>At least 3 holes of at least 24 inches each, no more than 8 feet apart, 1 in the deepest section.</dd> <dt>Torrance</dt><dd>2 holes of at least 3 feet by 3 feet, at the deep end and the shallow end.</dd> <dt>Agoura Hills</dt><dd>3 holes at least 2 feet in diameter in the pool and 1 in the spa.</dd> <dt>Palos Verdes Estates</dt><dd>2 holes of 3 feet at the shallow end and the deep end.</dd> <dt>Rancho Palos Verdes</dt><dd>At least 2 holes of 3 feet by 3 feet.</dd> <dt>Calabasas</dt><dd>The bottom removed or several holes punched.</dd> </dl>
Spas and attached features
An attached spa needs its own hole on some routes. On the Agoura Hills shell-in-place route, the spa takes 1 hole in addition to the 3 in the pool.
Who checks the holes
On LADBS jobs, a bottom inspection follows the finished holes and comes before any fill. AM J103 has Building and Safety inspect the holes before fill. The holes are also inspected before fill in Torrance.
What Can Go Back Into the Shell?
Clean soil or gravel goes back on LADBS Part III, and Agoura Hills caps any broken concrete at 3 inches.
Concrete debris
AM J103 allows bond beam concrete debris in the pool bottom on its shell-in-place route. Agoura Hills caps debris pieces at 3 inches on its shell-in-place route. Calabasas counts separated concrete as clean fill, along with soil, rock, gravel and sand, and bars painted materials.
Drainage rock
In Palos Verdes Estates, 1 foot of three-quarter-inch rock goes in before the soil. Agoura Hills calls for at least 12 inches of number 4 rock. On the Torrance shell-in-place route, sandy soil goes in 6-inch layers.
Fill material and compaction
LADBS requires clean soil or gravel on Part III, moistened and compacted by tractor rolling or mechanical tamping. For Part II, LADBS requires fill tested to at least 90 percent relative compaction by a soil testing agency the Department has approved. Agoura Hills sets 8-inch maximum lifts on its full removal route. Self-compacting fill, Type SE25 sand or clean fill dirt are allowed on the Agoura Hills shell-in-place route.
How Is the Fill Tested and Signed Off?
LADBS requires fill tested to at least 90 percent and a compaction report with a Certificate of Compliance on Part II.
No foundation construction shall occur until the compaction report has been reviewed and approved by the Department.
LADBS Bulletin P/BC 2026-111 places that rule in Part II. A site inside a Hillside Grading Area adds a Grading Pre-Inspection report under the same bulletin. LADBS can also require a soils report from a licensed soils engineer, covering temporary excavation, grading specifications and allowable bearing pressures.
Engineer roles outside the city
Rancho Palos Verdes requires a California licensed soils engineer or registered geotechnical engineer to monitor backfill, plus a compaction memo or report before the final. In Palos Verdes Estates, 90 percent compaction is approved through geotechnical memos, including a memo on drainage. Calabasas Option 1 places an engineer in charge under CBC 1803.5, with a report before the final. On a Torrance full removal, a soil engineer supervises and the compaction report is approved before the final.
Why the report matters later
LADBS ties any later foundation to the approved compaction report. Without that report, LADBS will not accept a foundation over the old pool area. A Part III fill never gets that report, so the ground stays limited to landscaping. In Torrance, the same idea appears as a building restriction that lifts only when the pool is re-abandoned to full removal standards.
What testing costs
Where code requires one, Angi lists an engineer at $115 to $225 per hour. Part III carries no compaction report, so those testing lines drop off a shell-in-place quote.
How Many Inspections Does Each Office Hold?
LADBS holds 3 inspections on both routes, while AM J103 lists 2 for County parcels.
LADBS inspections
- An initial meeting and inspection when the grading work is ready to start.
- A bottom inspection: the excavation on Part II, or the finished drainage holes on Part III.
- A final inspection after the fill is complete.
Inspections elsewhere
AM J103 lists a bottom or excavation inspection and a final inspection. A minimum of 2 inspections applies in Agoura Hills, one at removal and one at final. In Rancho Palos Verdes, the inspector checks the holes, the partial wall removal, the disconnects and the finished product. Palos Verdes Estates sends the inspector at the bond beam stage and again for a final after backfill. A site inspection before backfill applies in Calabasas.
<iframe src="https://www.youtube.com/embed/fP4MvsWcM28" width="560" height="315" title="Pool Demolition Los Angeles: Permit to Final Inspection" allowfullscreen></iframe>
The video above, Pool Demolition Los Angeles: Permit to Final Inspection, follows a Los Angeles pool demolition from the permit to the final inspection.
What About Hauling, Streets and Dumping?
Rancho Palos Verdes needs Public Works approval to import more than 20 cubic yards of dirt, and a haul route for 20 cubic yards or more.
Streets and the right-of-way
Stockpiling in the Calabasas right-of-way is barred, and work there needs a separate encroachment permit. Agoura Hills bars backfill storage on streets or the right-of-way without an encroachment permit.
Haul-off and receipts
Dump receipts for rubble are required in Palos Verdes Estates. Because Part II removes the shell from the site, the broken concrete leaves by truck. A local excavation contractor's 2026 guide notes that tight access, oversized decks and long haul routes push totals up.
Fill volume
On the Angi page, dirt fill runs $9 to $13.75 per cubic yard and gravel $5.75 to $9 per cubic yard. The LADBS Part II grading permit states the total cubic yards of fill. For County parcels, AM J103 bases the grading fee on the total cubic yards, and uses 50 cubic yards when the volume is unknown.
What Records Does the Finished Job Leave?
A finaled LADBS grading permit closes the backfill on the record, and the permit wording names the route.
A Chatsworth permit issued on August 21, 2026 reads "Backfill Swimming Pool with Uncertified Fill and Leaving the Pool Shell In-Place." A Palms - Mar Vista - Del Rey permit issued on August 19, 2026 reads "Backfill of swimming pool with certified fill." The LADBS online services portal holds the Permit and Inspection Report for each address, and Search Online Building Records offers documents available as PDFs.
Restrictions that stay with the parcel
LADBS limits a Part III area to landscaping, and Calabasas Option 2 adds a property record note that bars future construction. In Torrance, construction in the pool area or within 5 feet is barred unless the pool is re-abandoned to full removal standards. On County parcels, AM J103 requires a recorded Covenant for a Restricted Use Area before a permit issues. LADBS Form PC-STR.Mod 44 is a separate modification request with $255.06 in listed fees and a recorded covenant.
Building on Part II ground later
A Part II area can carry an ADU once the Department approves the compaction report. The LADBS ADU page states that removing covered parking for an ADU does not require replacing it. Fire sprinklers are not required in an ADU when the main house does not need them. Detached ADUs built from scratch must have solar panels. The approved standard plans list includes ADU62, a 1-story, 1-bedroom plan of 248 square feet, and ADU45, a 1-story, 3-bedroom plan of 1,200 square feet. For each site, LADBS still reviews zoning compliance and foundation requirements.
What the job costs overall
On Angi's Los Angeles page, full removal runs $4,550 to $18,200 and partial fill-in runs $2,850 to $11,350, with a $6,816 average. Angi puts most Los Angeles projects between $5,680 and $9,088. Angi lists aboveground pool removal at $340 to $910. A local excavation contractor's 2026 guide reports $8,000 to $18,000 for fill-in and $12,000 to $28,000 or more for full removal. By pool size, the Angi full removal ranges run $4,650 to $15,200 for a 15 by 30 foot pool, $6,350 to $17,150 for an 18 by 36 foot pool and $6,950 to $18,650 for a 20 by 40 foot pool. That guide also notes that full removal commonly runs 30 to 60 percent above a comparable fill-in.
Common misreadings
Removing the bond beam is not the same as removing the shell, and only Part II takes the whole shell away. A 12-inch hole meets the LADBS minimum but not the County, Torrance or Agoura Hills minimums. A finaled Part III permit does not open the area to building. A handout from one office never governs a parcel under another office.
Limits of this guide
The rules here come from each office's published handout, and the AM J103 copy dates from 2009. Handouts change, and the current version from the right office governs a job. The cost figures are published ranges, not bids. This guide was updated in November 2026.
Where the directory fits
Pool Removal Directory CA is a referral directory and does no pool work. The directory keeps a list of Los Angeles pool removal firms checked against California license records. For the rest of the directory, click here.
Sources
- LADBS Information Bulletin P/BC 2026-111, the City of Los Angeles backfill rules.
- LADBS Form PC-STR.Mod 44, the modification request.
- Los Angeles County AM J103 sheet, posted by La CaƱada Flintridge.
- Los Angeles County permit portal, for unincorporated parcels.
- County building division, building and safety in unincorporated areas.
- Angi Los Angeles pool removal cost page, for every Angi figure.
- ASTM D1557, the compaction test standard.
- ZIMAS, the City of Los Angeles parcel map.
- DigAlert, utility marking through 811.
- Contractors State License Board, the license lookup.
- LADBS online services portal, for permit records.
- California Building Standards Commission, the state building code body.
- LA Sanitation and Environment, the city sanitation department.
- Weebly pool removal guide, the permit and cost overview.